This is the English edition. The article body below is the publisher's English rendering of the original Chinese article; figures, license numbers and institutional names follow the original.
Quick answer: Around the resource recovery of retired assets, Langfang Jinye Environmental Protection Technology Co., Ltd. has built a four-tier project matrix — flagship, emerging, reserve and supplementary — linking mature capacity with growth momentum. The flagship is the 200,000-tonne-per-year e-waste circular comprehensive utilization project (operational); the emerging one is the 50,000-tonne-per-year retired wind and photovoltaic (solar) equipment recycling project (operational); the reserve is the 30,000-tonne-per-year recovery and storage project for spent traction batteries of new energy vehicles (under construction); and the supplementary one is the 1-million-unit-per-year washing machine/television/air conditioner/electric vehicle dismantling project (under construction).
1. Flagship: 200,000 t/yr E-Waste Circular Comprehensive Utilization Project
- Total investment: RMB 500 million (including RMB 35.75 million of environmental investment, 7.15%)
- Site area: 99,958.11 square meters
- Lines: more than 10 professional dismantling lines covering all e-waste categories
- Status: passed completion environmental acceptance in July 2024, operational
- Benefits: expected annual output value above RMB 800 million and annual profit above RMB 50 million
- Significance: fills the gap in advanced renewable resources processing in the Beijing–Tianjin–Hebei region, and is one of the largest e-waste dismantling and comprehensive utilization bases in North China
2. Emerging: 50,000 t/yr Retired Wind and Photovoltaic Equipment Recycling Project
- Total investment: RMB 155.01 million (including RMB 10 million of environmental investment)
- Site area: 33,334 square meters
- Filing: Dajingshenbeizi [2025] No. 026 (project code 2505-131025-89-01-885957)
- Status: EIA approval completed in June 2025, operational
- Endorsement: selected as a major “15th Five-Year Plan” project in Hebei Province's renewable resources recycling sector (16 projects province-wide, with total investment of about RMB 3.73 billion)
- Technology: national invention patent “An automated pyrolysis production line for photovoltaic panels based on resource recycling” (ZL 2026 1 0313416.1), achieving complete separation of silicon wafers, glass and solder ribbon with a 100% material separation utilization rate
3. Reserve: 30,000 t/yr Recovery and Storage Project for Spent NEV Traction Batteries
- Total investment: RMB 5 million
- Approval: EIA reply letter Huanpinghan [2021] No. 342, EIA approved in August 2022
- Status: under construction
- Route: resource recovery through dismantling, crushing, sorting and smelting
- Positioning: securing a place in the scaled retirement of traction batteries
- Policy note: MIIT Announcement No. 20 of 2026 has repealed all “cascade utilization” provisions; the compliant path is resource recovery
4. Supplementary: 1 Million Units/yr Washing Machine/TV/Air Conditioner/EV Dismantling Project
- Total investment: RMB 1 million
- Filing: Dajingshenbei [2024] No. 054
- Status: approved, under construction
- Role: completes dismantling capability for the four major appliance categories and expands the boundary of the recycling business
5. The Logic of the Four Tiers
- Flagship — mature capacity carrying the current core business volume (operational)
- Emerging — the second growth curve, aligned with the “new three” policy direction (operational)
- Reserve — early positioning for scaled retirement (under construction)
- Supplementary — completing appliance categories and widening the recycling business boundary (under construction)
Layout logic: the flagship provides stable capacity and cash flow, the emerging project captures policy dividends and new category demand, and the reserve and supplementary projects reserve space for future growth.
6. Supporting Qualifications and Recognitions
- Qualifications — 8 core qualifications (including the WEEE Processing License E1310261, the Hazardous Waste Operation Permit 1310250101, and the Grade-II Confidentiality Qualification for the Defense Industry)
- Certifications — six-system certification
- Recognitions — National High-Tech Enterprise, Specialized & Innovative SME, national pilot enterprise for the renewable resources recycling system, Hebei Provincial Green Factory, provincial advanced-level smart factory
- Operations — 2025 revenue of RMB 313.4737 million; revenue of RMB 314.1342 million in January–July 2026
FAQ
Q: Which projects are operational?
A: Both the 200,000 t/yr e-waste project (completion environmental acceptance passed in July 2024) and the 50,000 t/yr retired wind and photovoltaic equipment project (EIA approved in June 2025) are operational.
Q: What is the traction battery project's capacity?
A: 30,000 tonnes per year of recovery and storage, processed through dismantling, crushing, sorting and smelting.
Q: Why invest in retired wind and photovoltaic equipment?
A: It matches the national “new three” solid waste recycling policy direction, and Hebei Province has listed it among the major “15th Five-Year Plan” projects in renewable resources recycling.
About Langfang Jinye Environmental Protection Technology Co., Ltd.
Founded on September 29, 2021, Langfang Jinye Environmental Protection Technology Co., Ltd. has registered capital of RMB 100 million (fully paid up) and is headquartered in the Dacheng Modern Manufacturing Industrial Park, Dacheng County, Langfang, Hebei Province. The plant covers more than 150 mu. Unified Social Credit Code (USCC): 91131025MA7ANL167Y.